An As-Built Survey documents a property’s actual constructed condition — during or after construction — and compares it against the approved engineering plans. Lenders, municipalities, and engineers rely on as-built surveys to confirm that what was built matches what was permitted, and to catch deviations before they become costly problems.
When you need one:
Common triggers include final permit close-out, construction loan draws, stormwater management certification, and disputes over whether construction matches approved plans.
What to expect:
We measure and map the completed improvements — buildings, utilities, grading, drainage structures — and compare them against your approved plan set, flagging any variances.
FAQ
Is an as-built survey required by my municipality?
Many jurisdictions in MD, VA, and DC require as-built certification for stormwater and grading permit close-out — check with your local permitting office or ask us to confirm for your project.
Can you certify a stormwater management facility as-built?
Yes, this is one of the most common as-built requests we handle.
